APPLICATION
Pour mortar after mixing. Ensure, that air entrapped into the grout is allowed to escape. When carrying out base plate grouting, ensure sufficient head of pressure is maintained to keep mortar flow uninterrupted. Make sure, that necessary formwork is firmly in place and watertight.
Grouting of Machine Beds
Prewet thoroughly, no standing water in bolt holes. If possible, grout anchor bolts first, then the mortar bed in a second operation. Ensure continuous flow of mortar. Distance between anchor bolt and substrate to be at least 3 x max. diameter of mortar aggregates (approx. 5 mm.)
Grouting of Base Plates
Prewetting for approx. 24 hrs, no standing water. Maintain constant hydro-static pressure to ensure continuous flow. Use cable or chain to make sure that all cavities are filled. Make sure that entrapped air can escape.